MISIR Zaghloul El Bahary Atıksu Arıtma Tesisi (AAT) İnşaatı, Tasarım - İnşaat, Kusur Sorumluluğu

Document Type Contract Notice
[Considered the most important type of document, the Invitation to Tender gives details of who is making the purchase and where the documents can be obtained.]
Tender Title Zaghloul El Bahary Wastewater Treatment Plant (WWTP) Construction, Design – Build, Defects Liability Year and Optional One (1) Year Operation and Maintenance
Document Number 549308-2024
Recipient Name KAFR EL-SHEIKH WATER SUPPLY AND WATERFALLING COMPANY (KSWSSC), PROJECT IMPLEMENTATION UNIT (PIU)
Recipient Address Address: El-Estaad El-Reiady Street.
City: Kafr El-Sheikh City
Postal Code: 000
Attn: Eng. Mohamed Hesham, Project Implementation Unit (PIU) Manager (Mobile, +20 100 292 2279
Phone: +2047 323 4824
Fax: +2047 3243 631
Recipient Email kswep.piu@gmail.com
Recipient URL  
Recipient Country Sweetcorn
CPV Code 45200000
More Details Document Type: Contract Notification
Title: Zaghloul El Bahary Wastewater Treatment Plant (WWTP) Construction, Design and Build, Defects Liability Year and Optional One (1) Year Operation and Maintenance
Reference Number: EIB-GtP/KSWEP-P2-WT-01/H.M1.15
Contract Type: Works
Estimated Value: 23,000,000 - EUR
Description: The works to be executed under this works contract cover the permanent works (plants and systems) related to the new Zaghoul El Bahary WWTP (15,000 m3/d, 2037 - 25,000 m3/d, 2052) to be designed, constructed and commissioned in Motobas Zone, Kafr El Sheikh Governorate; the effective rectification of any defects during the 1 year Defects Liability Period; and optional 1 year normal operation and maintenance works for the WWTP. The Contract also includes the provision of training services to the Procuring Entity’s personnel duly completed within the Defects Liability Period or Optional 1 Year O&M Period and prior to the handover of the Works. Some minor works of the Plant have been carried out by another Contractor at an earlier stage. Although not part of the Works, the Contractor shall be aware of his obligations towards these Existing Works as defined in the Contract Documents. The average design capacity is 15,000 m3/day (6,000 kg BOD5/day) with a design horizon of 2037 (extended to 25,000 m3/day, 2052). The Plant will receive influent wastewater from in-system pumping stations and the treated wastewater will be discharged to the Zaghloul Main Drain. The process involves Extended Aeration Activated Sludge and will target the removal of carbon, nitrogen and suspended solids and sludge stabilization.
Authorization Type: ra
Document Title: Zaghloul El Bahary Wastewater Treatment Plant (WWTP) Construction, Design - Build, Defects Liability Year and Optional One (1) Year Operation and Maintenance
Date of Submission: 2024-09-10
Date of Publication: 2024-09-12
Date of Submission: 2024-11-06
Closing date 2024-11-06
Document Click here for more information: